top of page


The Center of the Project Is Not the Whole Project
How external conditions change at the perimeter—and why a continuous record matters. Construction teams are built to manage movement. Schedules move, crews move, materials move, and access changes as the work advances. Earth is cut, placed, compacted, and reshaped. What appears fixed on a plan can change several times before the week is over. Most of the attention naturally goes to the center of the project, where production happens and where sequencing, manpower, procurement

THE FLYING LIZARD
Aug 306 min read
Â
Â
Â


The Day We Realized We Weren't Modeling Aircraft
We thought we were building a 3D model of an aircraft. We were wrong. What we were actually building was a way to see change. The original idea seemed simple enough. Capture an aircraft with a level of detail that would allow us to create a highly accurate digital representation of its exterior condition. Every panel, every rivet line, every antenna, every surface detail preserved in a way that could be viewed, measured, and revisited long after the aircraft had left the hang

THE FLYING LIZARD
Jun 33 min read
Â
Â
Â
THE DRONE BUZZ
THE FLYING LIZARD FIELD NOTES
Re-writing The Skies
bottom of page
