Construction margins rarely disappear because of one catastrophic decision. More often, they erode a little at a time. A material quantity is based on last week’s conditions. A crew is scheduled around work that wasn’t as far along as expected. A stockpile looked sufficient from the ground. A change was noticed only after the next trade had already moved in. None of those decisions necessarily looks unreasonable when it is made. The problem is that the information behind it m