Sun Tzu Construction Doctrine 5: What You Assume Will Decide Your Outcome
On a high-rise project, the project manager assumed that the foundation walls had been poured perfectly per plan. No one re-checked the elevations or alignment before the next phase of framing began. By midweek, the first beams were misaligned, scaffolding clashed, and corrective work cost the team multiple days and thousands of dollars. Sun Tzu warned against the enemy we do not see. In construction, that enemy is assumption. Every unverified belief about a site, schedule, o

THE FLYING LIZARD
Oct 252 min read


Sun Tzu Construction Doctrine 4: Delayed Visibility Is the Same as Ignorance
A mid-rise office project was scheduled to pour a concrete slab over a foundation. The team assumed that last week’s inspection had covered all edges. When crews arrived, access to one corner was blocked by scaffolding erected prematurely. A small delay — one day — caused a chain reaction: multiple trade schedules collided, crane time was rescheduled, and the project lost nearly a week cumulatively. Sun Tzu understood the decisive power of timing. On the construction site, de

THE FLYING LIZARD
Jul 82 min read


Eyes in the Sky: Why THE FLYING LIZARD Documents Every Phase of Construction
C onstruction projects are high-stakes, high-dollar, and high-risk. Yet so much still gets lost in miscommunication, missed milestones,...

THE FLYING LIZARD
Oct 7, 20252 min read